O2 Victoria Warehouse Manchester

Working with our friends at Fagan Electrical, Robolights designed and manufactured this 400A Stage Temporary Power Distribution Unit for installation at the O2 Victoria Warehouse in Old Trafford, Manchester. The unit provides single and three phase power outlets from 16A to 125A along with a sequential Powerlock connection unit.