City Hall Newcastle

Working with our friends at specialist Electrical Contractor Fagan Electrical, Robolights designed and manufactured this 250A Stage Temporary Power Distribution Unit for installation in this Grade 2 listed venue as part of a major upgrade. The unit provides single and three phase power outlets from 16A to 125A along with a sequential Powerlock connection unit and was finished in light ivory to help it blend in with the décor of the building.